{"id":191949,"date":"2026-09-17T14:30:54","date_gmt":"2026-09-17T14:30:54","guid":{"rendered":"https:\/\/aviacionaldia.com\/?p=191949"},"modified":"2026-09-18T11:57:14","modified_gmt":"2026-09-18T11:57:14","slug":"ge-aerospace-confident-ge9x-mid-seal-issue-will-not-delay-boeing-777x-entry-into-service","status":"publish","type":"post","link":"https:\/\/aviacionaldia.com\/en\/2026\/09\/ge-aerospace-confident-ge9x-mid-seal-issue-will-not-delay-boeing-777x-entry-into-service.html","title":{"rendered":"GE Aerospace Confident GE9X Mid-Seal Issue Will Not Delay Boeing 777X Entry into Service"},"content":{"rendered":"\n<p><strong>GE Aerospace<\/strong> has ruled out that durability issues identified in the <strong>GE9X<\/strong> engine mid-seal will compromise the<strong> Boeing 777X <\/strong>program schedule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical Resolution and Engine Certification Progress<\/h2>\n\n\n\n<p>Speaking at an investor conference hosted by Morgan Stanley, GE Aerospace Chief Financial Officer Rahul Ghai expressed confidence that this issue will not postpone the commercial debut of Boeing\u2019s new widebody twinjet.<\/p>\n\n\n\n<p>The American engine manufacturer disclosed in February that it was assessing a seal durability issue on the GE9X power plant. Subsequently, in April, the company announced that it had determined the root cause, was finalizing the technical fix, and did not anticipate any disruptions to the program timeline.<\/p>\n\n\n\n<p><strong><em>\u2192 <a href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/boeing-faces-delays-in-stabilizing-737-max-production.html\">Boeing Faces Delays in Stabilizing 737 MAX Production<\/a><\/em><\/strong><\/p>\n\n\n\n<p>According to details outlined by Rahul Ghai:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Test Findings:<\/strong> Testing revealed that the mid-seal\u2014a component responsible for joining the forward and aft sections of the engine\u2014did not demonstrate the durability levels originally anticipated by the company.<\/li>\n\n\n\n<li><strong>Redesign and Integration:<\/strong> GE Aerospace redesigned the part and began shipping GE9X engines equipped with the updated component to Boeing starting in the third quarter.<\/li>\n\n\n\n<li><strong>Internal Validation:<\/strong> The manufacturer holds a high degree of confidence in the redesigned component following internal testing, having already integrated it into production-line engines.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Regulatory Roadmap and Next Steps with the FAA<\/h2>\n\n\n\n<p>The approval process with the Federal Aviation Administration (FAA) is being conducted across two parallel regulatory tracks:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Certification of the Redesigned Component<\/h3>\n\n\n\n<p>GE Aerospace expects formal FAA certification of the redesigned seal in the coming months.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Flight Test Continuity and ETOPS Evaluation<\/h3>\n\n\n\n<p>The original seal design remains fully valid and airworthy for ongoing certification flight testing, including the prerequisite approvals required for Boeing to commence Extended-range Twin-engine Operational Performance Standards (ETOPS) flight test trials. Concurrently, the redesigned seal intended for serial production aircraft is being processed through an independent FAA certification track.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"related-topics\">Related Topics<\/h2>\n\n\n\n\t\t\t<div class=\"wp-block-uagb-post-grid uagb-post-grid  uagb-post__image-position-top uagb-post__image-enabled uagb-block-9e302684     uagb-post__items uagb-post__columns-2 is-grid uagb-post__columns-tablet-2 uagb-post__columns-mobile-1 uagb-post__equal-height\" data-total=\"216\" style=\"\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<article class=\"uagb-post__inner-wrap\">\t\t\t\t\t\t\t\t<div class='uagb-post__image'>\n\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-posts-9-rise-in-aircraft-deliveries-through-august-stays-on-track-for-full-year-target.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\" class='uagb-image-ratio-inherit'><img decoding=\"async\" width=\"800\" height=\"400\" src=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2019\/01\/Airbus-factory.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2019\/01\/Airbus-factory.jpg 800w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2019\/01\/Airbus-factory-300x150.jpg 300w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2019\/01\/Airbus-factory-768x384.jpg 768w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2019\/01\/Airbus-factory-380x190.jpg 380w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<h4 class=\"uagb-post__title uagb-post__text\">\n\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-posts-9-rise-in-aircraft-deliveries-through-august-stays-on-track-for-full-year-target.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Airbus Posts 9% Rise in Aircraft Deliveries Through August, Stays on Track for Full-Year Target<\/a>\n\t\t\t<\/h4>\n\t\t\t\t\t\t<div class='uagb-post__text uagb-post-grid-byline'>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"uagb-post__text uagb-post__cta wp-block-button\">\n\t\t\t\t<a class=\"wp-block-button__link uagb-text-link\" style=\"\" href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-posts-9-rise-in-aircraft-deliveries-through-august-stays-on-track-for-full-year-target.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Read More<\/a>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t\t\t\t<\/article>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<article class=\"uagb-post__inner-wrap\">\t\t\t\t\t\t\t\t<div class='uagb-post__image'>\n\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-forced-to-slow-a330neo-deliveries-after-finding-tool-inside-aircrafts-horizontal-stabilizer.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\" class='uagb-image-ratio-inherit'><img decoding=\"async\" width=\"800\" height=\"400\" src=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/09\/Airbus-A330neo.webp\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/09\/Airbus-A330neo.webp 800w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/09\/Airbus-A330neo-300x150.webp 300w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/09\/Airbus-A330neo-768x384.webp 768w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/09\/Airbus-A330neo-380x190.webp 380w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<h4 class=\"uagb-post__title uagb-post__text\">\n\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-forced-to-slow-a330neo-deliveries-after-finding-tool-inside-aircrafts-horizontal-stabilizer.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Airbus Forced to Slow A330neo Deliveries After Finding Tool Inside Aircraft\u2019s Horizontal Stabilizer<\/a>\n\t\t\t<\/h4>\n\t\t\t\t\t\t<div class='uagb-post__text uagb-post-grid-byline'>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"uagb-post__text uagb-post__cta wp-block-button\">\n\t\t\t\t<a class=\"wp-block-button__link uagb-text-link\" style=\"\" href=\"https:\/\/aviacionaldia.com\/en\/2026\/09\/airbus-forced-to-slow-a330neo-deliveries-after-finding-tool-inside-aircrafts-horizontal-stabilizer.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Read More<\/a>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t\t\t\t<\/article>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<article class=\"uagb-post__inner-wrap\">\t\t\t\t\t\t\t\t<div class='uagb-post__image'>\n\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-workers-in-spain-launch-indefinite-strike.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\" class='uagb-image-ratio-inherit'><img decoding=\"async\" width=\"800\" height=\"400\" src=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/07\/Airbus.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/07\/Airbus.jpg 800w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/07\/Airbus-300x150.jpg 300w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/07\/Airbus-768x384.jpg 768w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/07\/Airbus-380x190.jpg 380w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<h4 class=\"uagb-post__title uagb-post__text\">\n\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-workers-in-spain-launch-indefinite-strike.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Airbus Workers in Spain Launch Indefinite Strike<\/a>\n\t\t\t<\/h4>\n\t\t\t\t\t\t<div class='uagb-post__text uagb-post-grid-byline'>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"uagb-post__text uagb-post__cta wp-block-button\">\n\t\t\t\t<a class=\"wp-block-button__link uagb-text-link\" style=\"\" href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-workers-in-spain-launch-indefinite-strike.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Read More<\/a>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t\t\t\t<\/article>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<article class=\"uagb-post__inner-wrap\">\t\t\t\t\t\t\t\t<div class='uagb-post__image'>\n\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-targets-september-for-a350f-maiden-flight.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\" class='uagb-image-ratio-inherit'><img decoding=\"async\" width=\"800\" height=\"400\" src=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/11\/Airbus-A350F.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/11\/Airbus-A350F.jpg 800w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/11\/Airbus-A350F-300x150.jpg 300w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/11\/Airbus-A350F-768x384.jpg 768w, https:\/\/aviacionaldia.com\/wp-content\/uploads\/2023\/11\/Airbus-A350F-380x190.jpg 380w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<h4 class=\"uagb-post__title uagb-post__text\">\n\t\t\t\t<a href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-targets-september-for-a350f-maiden-flight.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Airbus Targets September for A350F Maiden Flight<\/a>\n\t\t\t<\/h4>\n\t\t\t\t\t\t<div class='uagb-post__text uagb-post-grid-byline'>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<div class=\"uagb-post__text uagb-post__cta wp-block-button\">\n\t\t\t\t<a class=\"wp-block-button__link uagb-text-link\" style=\"\" href=\"https:\/\/aviacionaldia.com\/en\/2026\/08\/airbus-targets-september-for-a350f-maiden-flight.html\" target=\"_self\" rel=\"bookmark noopener noreferrer\">Read More<\/a>\n\t\t\t<\/div>\n\t\t\t\n\t\t\t\t\t\t\t\t\t<\/article>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t","protected":false},"excerpt":{"rendered":"GE Aerospace has ruled out that durability issues identified in the GE9X engine mid-seal will compromise the Boeing&hellip;\n","protected":false},"author":4316,"featured_media":187578,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[190],"tags":[222,220,455],"class_list":{"0":"post-191949","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-the-industry","8":"tag-aircraft","9":"tag-boeing-2","10":"tag-general-electric-2"},"uagb_featured_image_src":{"full":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"thumbnail":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-150x150.webp",150,150,true],"medium":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-300x150.webp",300,150,true],"medium_large":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-768x384.webp",768,384,true],"large":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"1536x1536":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"2048x2048":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"pk-small":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-80x80.webp",80,80,true],"pk-thumbnail":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-300x225.webp",300,225,true],"csco-small":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-80x80.webp",80,80,true],"csco-intermediate":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-200x140.webp",200,140,true],"csco-thumbnail":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-380x220.webp",380,220,true],"csco-thumbnail-alternative":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-300x180.webp",300,180,true],"csco-thumbnail-uncropped":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-380x190.webp",380,190,true],"csco-medium":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"csco-medium-alternative":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X-560x336.webp",560,336,true],"csco-medium-uncropped":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"csco-large":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"csco-large-uncropped":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false],"csco-extra-large":["https:\/\/aviacionaldia.com\/wp-content\/uploads\/2026\/05\/Boeing-777X.webp",800,400,false]},"uagb_author_info":{"display_name":"Redacci\u00f3n - Aviaci\u00f3n al D\u00eda","author_link":"https:\/\/aviacionaldia.com\/en\/author\/aad"},"uagb_comment_info":0,"uagb_excerpt":"GE Aerospace has ruled out that durability issues identified in the GE9X engine mid-seal will compromise the Boeing&hellip;","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/posts\/191949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/users\/4316"}],"replies":[{"embeddable":true,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/comments?post=191949"}],"version-history":[{"count":1,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/posts\/191949\/revisions"}],"predecessor-version":[{"id":191950,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/posts\/191949\/revisions\/191950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/media\/187578"}],"wp:attachment":[{"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/media?parent=191949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/categories?post=191949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aviacionaldia.com\/en\/wp-json\/wp\/v2\/tags?post=191949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}