LOT Polish Airlines has taken delivery of the first of three Embraer E195-E2 aircraft leased through Azorra.
LOT adds the E2 to its fleet to improve operational flexibility and accommodate network expansion. Delivery of the remaining aircraft is scheduled to be completed in October.
→ Embraer Reveals Upgrades Across its Commercial E-Jet Range
“Twenty years after the delivery of the first Embraer E-170, the LOT Polish Airlines fleet will be expanded by three Embraer E195-E2 aircraft. With these aircraft, we will increase the frequency of flights to selected European cities, offering passengers a high level of comfort in the latest generation fleet,” says Michał Fijoł, President of the Management Board of LOT Polish Airlines.
LOT was the first operator of E-Jets in 2004. The first flight was made in an E170 from the Polish capital to Vienna on March 17 of the same year.
Related Topics
Turkish Airlines Warns It Could Switch Boeing 737 MAX Order to Airbus if Engine Negotiations Fail
SWISS’s First Airbus A350 Lands in Zurich, Marking a New Era for Airline
Airbus Delivers 507 Commercial Aircraft from January to September 2025
Airbus A320 Surpasses Boeing 737 to Become Most Delivered Aircraft in History

Plataforma Informativa de Aviación Comercial con 13 años de trayectoria.